View our reviews on Google

What is a Phase II ESA?

If the Phase l ESA determines the possibility of site contamination, a Phase ll ESA, consisting of a sampling plan to help determine the extent of the potential contamination at the site, would be performed. This service typically consists of collecting a series of subsurface samples that are analyzed by a certified laboratory. A final report will be generated with the sampling plan’s findings, analytical results, JLM Environmental’s professional opinion, and remediation recommendations to keep your project moving forward.

Phase II Testing Options:

  • Ground water

  • Soil

  • Surface water

  • Soil Vapor

  • Vapor Intrusion

  • Asbestos

  • Lead

  • Mold

  • Radon

Return to Top